We have completed the installation of a lining system on another 2 no. attenuation ponds for WM Donald Ltd for a new housing development site.
A protective geotextile was used below and above the liner.
The works also included the fixing of the liner to 5 no. headwalls in total.
Conditions on site at this time of year, on a site located within East coast of Scotland were a challenge to say the least, however our lads pulled it out the bag, much to the delight of the client!