Last week we completed a 13 200m2 stockpile cover for a repeat client.
8 x 15m x 110m long panels of both our Power Scrim 400 and Net Down ballast system were fabricated in our workshop, and then installed on site by our installation team.
This is the third phase of works we have completed for ICL Group, covering a polysulphate material which needs to be kept dry for the clients manufacturing process.
For any stockpile cover requirements, please contact us to discuss.