×
About Us
Products
Case Studies
News
Contact Us
About Us
Products
Case Studies
News
Contact Us
Search
Search
Photo Gallery
Home
/
Photo Gallery
Pond lining installation – Dunfermline
Pond lining installation – Dunfermline
Pond lining installation – Dunfermline
MSE vegetated wall after hydroseeding – before germination.
MSE vegetated wall after hydroseeding – before germination.
MSE vegetated wall after hydroseeding – before germination.
Salt pile cover using Netdown system – France.
Salt pile cover using Netdown system – France.
Salt pile cover using Netdown system – France.
Arbroath Flood Scheme – Brothock Meadows.
Arbroath Flood Scheme – Brothock Meadows.
Arbroath Flood Scheme – Brothock Meadows.
Arbroath Flood Scheme – Brothock Meadows.
Domestic application for MSE Vegetated Wall
MSE Vegetated Wall build underway
Lovely curved finish
Hydro-seeding was completed last July and is it amazing have quickly it has established.
Another angle of the hydro-seeding.
New liner being extrusion welded to existing attenuation liner
Extrusion weld completed to existing pond liner
SuperFlex 1000 liner installed and HBB 300 protective geotextile placed on top
SuperFlex 1000 (1mm PP) being wedge welded onsite
Attenuation liner being fitted to a concrete headwall
Liner fixed to headwall
Topsoil being placed upon attenuation pond lining system
2120m2 pond extension complete, topsoil being placed
12m wide x 74m long panel of our Power Scrim 1000 deployed
2200m attenuation ready for lining
1 x 29m wide x 29m long pre-welded panel of our Power Scrim 1000 deployed
2200m2 completed within 6 working hours
132m long pond, lined using 3 pre-welded panels, requiring only 2 onsite welds
Onsite wedge weld
Attenuation pond lined with a GCL
1200m2 pond lined with GCL
6500m2 attenuation pond being lined with GCL
Topsoil being placed on top of GCL
GCL pond lining
MSE Vegetated Wall Domestic Build- the start of the build. The progress since then has been amazing!
MSE Vegetated Wall Domestic Build- Hydro-seeding
MSE Vegetated Wall Domestic Build- Hydro-seeding being added
MSE Vegetated Wall Domestic Build- Another angle of the hydro-seeding
MSE Vegetated Wall Domestic Build- Another angle of the hydro-seeding
Attenuation Pond Liner
MSE Vegetated Wall
Industrial Bulk Stockpile Cover
MSE Vegetated Wall
Temporary Cap
Peatland Restoration using RePeat matting – Rottal Estate. (750m)
MSE Vegetated Wall
MSE Vegetated Wall
MSE Vegetated Wall
MSE Vegetated Wall
MSE Vegetated Wall
ReDam Blocks
RePeat Restoration Matting
Saltpile Cover
Industrial Bulk Stockpile Cover
Japanese Knotweed Barrier
Estate Management Solutions
Contaminated Soil Windrow Cover
Automated Pre-welded Panel fabrication machine
Chemically resistant tank bund liner
Attenuation Pond completed with GCL
Attenuation Pond Lining System
Attenuation Pond Liner – HBB 300 and 1mm HDPE
Attenuation Pond – HBB 300 and Power Scrim 750
Attenuation Pond – HBB 300 and Power Scrim 750, both supplied in pre-welded panels
Attenuation Liner fabricated into one pre-welded panel
Aquaponic Liner
Aquaponic Liner
Aquaponic Liner
Attenuation Pond lining system
Attenuation Tank
Attenuation Pond – HBB 300 geotextile and 1mm HDPE
Temporary Landfill Cap on an interphase slope
Attenuation Pond liner fixed to a headwall with stainless steel batten and neoprene strapping
Leachate well fixed to our temporary capping liner using a pre-fabricated top hat and HBB butyl tape
HBB 300 geotextile supplied and installed in one, pond specific sized pre-welded panel
Power Scrim 1000 installed in one, pond specific sized pre-welded panel for a habitat pond
Our Japanese Knotweed barrier supplied for a Network Rail contract
Japanese Knotweed Burial Cell lined with our Power Scrim 600 Japanese Knotweed Barrier
Temporary landfill cap installed on a stepped interphase slope
40 000m2 Net Down ballast system installation in the US
HBB installation team welding on an attenuation pond job
HBB 100 geotextile installed for a horse arena application, supplied in one, arena specific sized pre-fabricated panel
38 000m2 temporary landfill cap
Temporary capping liner fixed to gas well using a pre-fabricated top hat and HBB Butyl tape
Large Japanese Knotweed Burial Cell lined with our Power Scrim 600 Japanese Knotweed Barrier, supplied in one, cell specific sized pre-welded panel
A pre-fabricated panel of our HBB 300 geotextile being readied for shipment
A load of pre-welded panels of our Power Scrim 400 and Net Down ballast system being shipped for a temporary landfill capping job
A completed settlement pond lined with our Power Scrim 1000, inert material placed on top of the liner
Estate Management – A drinking pool lined with our Power Scrim 600
2 x 29m wide x 29m long pre-welded panels deployed within 1 working hour
Japanese Knotweed barrier installed in a vertical application
This MSE Vegetated Wall wall will be fully vegetated and carbon negative within 12 months of hydroseeding
A fully vegetated MSE Vegetated Wall headwall / outlet pipe repair
This eroded embankment and outlet repair now fully stabilised against any future erosion
MSE Vegetated Wall providing an awesome vegetated finish, would you rather this or a hard engineered solution………
Vegetation establishing nicely on a 130m MSE Vegetated Wall retaining wall build
HBB Pre-Seeded Matting
Salt Pile