A remediation project that we have serviced and supplied and installation of a containment lining system for a repeat client.
As part of a Bio-Remediation project, our client required to line a containment bund.
To prevent the need for any onsite welding, we fabricated 3 panels x 10m wide x 13.5m long of our HBB 300 protective geotextile, and 1 panel x 10m wide x 13.5m long of SuperFlex 1000 which were then installed by a 2 man team, in 3o minutes!
No on-site welding ✅
30 minute install time ✅
Client ahead of program ✅